A white study model of a leaning streetlight on a grey tile, with one amber arc rising from it to a white civic building.

For road and electricity authorities

Infrastructure Cost Recovery

Recovering the cost of damage to public infrastructure from the parties responsible for it.

The cost that stays with the authority

The legal right to recover the cost already exists.

Public road and electricity infrastructure is damaged every day. The authority repairs it and absorbs the cost. The drivers responsible, and their insurers, pay nothing. Techrise Africa supplies the process to exercise that right, as a single managed function.

  • Traffic signals
  • Streetlight poles
  • Road signage and markings
  • Guardrails
  • Barriers
  • Bridges
  • Stormwater structures

Infrastructure cost recovery

The six stages of a claim

From the scene of the damage to monthly reporting.

  1. The streetlight's case close up: the bent pole on its grey tile with its amber pin, and the civic building beyond.

    Stage 1 of 6

    Scene intelligence

    Incident details are captured at the scene.

  2. Side on to the bent streetlight: a dashed outline of the pole as it stood, and amber lines measuring its lean.

    Stage 2 of 6

    Case engineering

    The scene record is turned into a validated, quantified claim.

  3. Along the tile's base: a repair quotation sheet stands beside the bent pole, with an amber tick on it.

    Stage 3 of 6

    Repair quotation and approval

    The damage is costed through approved suppliers, and you sign off the quotation.

  4. Lifting toward the civic building: the amber arc from the streetlight's pin on its way to the asset owner.

    Stage 4 of 6

    Demand and recovery

    The responsible party is pursued for the cost.

  5. Low beside the arc: a gate stands across it, where the return is held.

    Stage 5 of 6

    Litigation management

    Matters that stay unresolved are escalated through appointed attorneys.

  6. Pulling back out: the pole stands upright again, and the arc reaches the civic building.

    Stage 6 of 6

    Reporting and governance

    Monthly reporting to you, with full visibility throughout.

Roles

What stays with you, and what we carry.

Stays with you

  • The mandate to recover.
  • Sign-off on repair quotations.
  • Enforcement and penalty decisions, taken by your authorised officials.

Carried by Techrise Africa

  • Investigating, quantifying and recovering each matter.
  • Funding the recovery operation, the case management and the legal work.
  • Monthly reporting, structured to suit your own governance.
  • Responsibility for the result, as your one point of accountability.

Reporting and analytics

Reports that show where and when your infrastructure is damaged.

Your monthly report also shows what our matters reveal about your network.

Where
The roads and sites where damage happens most often
When
The times and periods when damage happens most often

How it is paid

If nothing is recovered, nothing is owed.

Upfront cost to you
None
Capital outlay
None
Fees
Only from money recovered

Contact

Start a mandate conversation.

Techrise Africa (Pty) Ltd.

Leave your details and we will call you back.

Your details

Please do not include sensitive information, such as health details or details of criminal matters.

Registered office

Woodlands Office Park, Building 16, 2nd Floor
20 Woodlands Drive, Woodmead
Johannesburg, Gauteng, 2191
South Africa